Technical Papers
Miscellaneous Papers
> Fast-track Float-in
> Cylinder Pile Potential
> Construction of Elements for the Oresund Immersed Tunnel
> Tapping Technology
> The Oresund Link Immersed Tunnel
> Advances in Underwater Concreting: St. Lucie Plant Intake Velocity Cap Rehabilitation
> Pre-cast concrete applications for navigation dams and bridge piers
> Modular Concepts for Rapid Repair of Navy Waterfront Structures
> Evaluation of Minimum Bridge Span Openings Applying Ship Domain Theory
> Effective Assessment of Repairs
> Development of Self-Compacting Lightweight Concrete
> Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate Anchors
> Evolution of Foundations for Overwater Bridges

ICCGS 2001 2nd International Conference on Collision and Grounding of Ships
> Survey of Ship Tracks in Fehmarn Belt

American Society of Civil Engineers - National Convention Seattle, WA
The ASCE Construction Division honored Ben C. Gerwick, Jr.
The Tsing-Ma Suspension Bridge

SEAONC
Innovative Marine/Inland Waterways: Construction Techniques

Oresund Link Immersed Tunnel Conference
> Prefabrication of Tunnel Elements - Paper D2
> Contractor-Designer Teamwork, The Key Element of Success in Design Built - Paper D3

IABSE Congress
Marine Transportation Projects Use Innovative "In-the-Wet" Construction Techniques
Innovative Overwater Trestle Replacement

ING-IABSE Colloquium on Foundations for Major Bridges: Design and Construction

> Large Diameter Steel Tubular Piles for Optimum Seismic Performance

IABSE Colloquium on Tunnel Structures
> Construction

15th IABSE Congress
> Pier Protection of the New Sidney Lanier Bridge

IABSE Symposium. San Francisco 1995
> Presidio Viaduct Seismic Retrofitting
> Repair of Corrosion Damages and Protection of Cooling Water Intake/Circulation Structures

IV Coloquio Internacional sobre el enlace fijo del Estrecho de Gibraltar
> Preparation of foundations and construction of deep water piers

International Offshore and Polar Engineering Conference
>The Marine Transport of Natural Gas in Hydrate Form

ASCE Convention & Exposition
> Substructure Construction Methods. I-205 Columbia River Bridge
 
 

Projects keyword search

Date:

 
2009 Catalog
November '09 Newsletter
 
locations
Project Locations
 
 
 

cowi

 

BT

 

occ

 

Copyright MMIX - Ben C. Gerwick, Inc. - 20 California St., Ste. 400 San Francisco CA 94111
tel. 415-398-8972 | fax 415-398-0433 | e-mail: info@gerwick.com